ITAC Assessment: MA0773
ITAC logo
ITAC Assessment: MA0773
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product metal nozzles
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 60,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,440 1,452,733
kWh
Electricity Demand $60,299 4,577
kW-mo/yr
Electricity Fees $8,766 -
LPG $103,573 7,028
MMBtu
TOTAL YEARLY COSTS $352,078
RECOMMENDED SAVINGS* $34,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2414: Use waste heat from hot flue gases to preheat $16,653 $30,000 - $16,653
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,580 $14,050 $8,580
69,196
kWh
-
03 2.7313: Recycle air for heating, ventilation and air conditioning $5,593 $10,625 $(-6,167.0)
(-49,761)
kWh
$11,760
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,564 $6,660 $1,564
12,611
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,500 $1,000 $1,500
12,098
kWh
-
06 2.1122: Re-size charging openings or add a movable door on equipment $501 $100 - $501
-
MMBtu
TOTAL RECOMMENDED $34,391 $62,435 $5,477
44,144
kWh
$28,914
-
MMBtu
TOTAL IMPLEMENTED $15,673 $25,675 $3,913
31,533
kWh
$11,760
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs