ITAC Assessment: MA0767
ITAC logo
ITAC Assessment: MA0767
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Aircraft engine part repair and overhaul
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 35,000
ft2
Annual Production 7,800
pieces
Production Hrs. Annual 6,084
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,858 2,659,175
kWh
Electricity Demand $135,159 10,491
kW-mo/yr
Electricity Fees $9,771 -
Natural Gas $33,939 4,282
MMBtu
TOTAL YEARLY COSTS $478,727
RECOMMENDED SAVINGS* $48,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,841 $74,750 $28,675
253,760
kWh
$6,453
-
kW-mo/yr
$(-4,287.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,408 $15,090 $7,821
69,212
kWh
$1,765
-
kW-mo/yr
$(-1,178.0)
-
MMBtu
03 2.7314: Reduce ventilation air $7,620 $3,955 $4,925
43,585
kWh
- $2,695
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $911 $3,330 $911
8,059
kWh
- -
05 2.2136: Install / repair insulation on steam lines $461 $157 $461
4,076
kWh
- -
06 2.2136: Install / repair insulation on steam lines $361 $274 - - $361
-
MMBtu
TOTAL RECOMMENDED $48,602 $97,556 $42,793
378,692
kWh
$8,218
-
kW-mo/yr
$(-2,409.0)
-
MMBtu
TOTAL IMPLEMENTED $9,353 $7,716 $6,297
55,720
kWh
- $3,056
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs