| Assessment Year | 2016 |
|---|---|
| Principal Product | Aircraft engine part repair and overhaul |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 132 |
| Plant Area |
35,000
ft2
|
| Annual Production | 7,800
pieces
|
| Production Hrs. Annual | 6,084
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $299,858 | 2,659,175 |
kWh
|
$0.11 |
| Electricity Demand | $135,159 | 10,491 |
kW-mo/yr
|
$12.88 |
| Electricity Fees | $9,771 | - |
|
- |
| Natural Gas | $33,939 | 4,282 |
MMBtu
|
$7.93 |
| TOTAL YEARLY COSTS | $478,727 | |||
| RECOMMENDED SAVINGS* | $48,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,353 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $30,841 | $74,750 |
$28,675
253,760
kWh
|
$6,453
-
kW-mo/yr
|
$(-4,287.0)
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,408 | $15,090 |
$7,821
69,212
kWh
|
$1,765
-
kW-mo/yr
|
$(-1,178.0)
-
MMBtu
|
|
| 03 | 2.7314: Reduce ventilation air | $7,620 | $3,955 |
$4,925
43,585
kWh
|
- |
$2,695
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $911 | $3,330 |
$911
8,059
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $461 | $157 |
$461
4,076
kWh
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $361 | $274 | - | - |
$361
-
MMBtu
|
|
| TOTAL RECOMMENDED | $48,602 | $97,556 |
$42,793
378,692
kWh
|
$8,218
-
kW-mo/yr
|
$(-2,409.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,353 | $7,716 |
$6,297
55,720
kWh
|
- |
$3,056
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs