Assessment Year | 2016 |
---|---|
Principal Product | Injction molded components |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 139 |
Plant Area |
44,000
ft2
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,981 | 2,304,000 |
kWh
|
$0.088 |
Electricity Demand | $80,763 | 6,520 |
kW-mo/yr
|
$12.39 |
Electricity Fees | $8,320 | - |
|
- |
Natural Gas | $3,168 | 205 |
MMBtu
|
$15.45 |
TOTAL YEARLY COSTS | $295,232 | |||
RECOMMENDED SAVINGS* | $47,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,910 | $95,901 |
$19,910
226,251
kWh
|
- | - | |
02 | 2.3212: Optimize plant power factor | $15,004 | $12,000 | - |
$15,004
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,000 | $1,000 |
$7,000
79,545
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,076 | $4,235 |
$3,076
34,957
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,576 | $1,152 |
$1,576
17,907
kWh
|
- | - | |
06 | 2.7314: Reduce ventilation air | $1,080 | $900 |
$212
2,404
kWh
|
- |
$868
-
MMBtu
|
|
TOTAL RECOMMENDED | $47,646 | $115,188 |
$31,774
361,064
kWh
|
$15,004
-
kW-mo/yr
|
$868
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,660 | $15,052 |
$8,788
99,856
kWh
|
$15,004
-
kW-mo/yr
|
$868
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs