ITAC Assessment: MA0765
ITAC logo
ITAC Assessment: MA0765
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Injction molded components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 44,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,981 2,304,000
kWh
Electricity Demand $80,763 6,520
kW-mo/yr
Electricity Fees $8,320 -
Natural Gas $3,168 205
MMBtu
TOTAL YEARLY COSTS $295,232
RECOMMENDED SAVINGS* $47,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,910 $95,901 $19,910
226,251
kWh
- -
02 2.3212: Optimize plant power factor $15,004 $12,000 - $15,004
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,000 $1,000 $7,000
79,545
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,076 $4,235 $3,076
34,957
kWh
- -
05 2.7135: Install occupancy sensors $1,576 $1,152 $1,576
17,907
kWh
- -
06 2.7314: Reduce ventilation air $1,080 $900 $212
2,404
kWh
- $868
-
MMBtu
TOTAL RECOMMENDED $47,646 $115,188 $31,774
361,064
kWh
$15,004
-
kW-mo/yr
$868
-
MMBtu
TOTAL IMPLEMENTED $24,660 $15,052 $8,788
99,856
kWh
$15,004
-
kW-mo/yr
$868
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs