ITAC Assessment: MA0758
ITAC logo
ITAC Assessment: MA0758
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 9
Plant Area 80,000
ft2
Annual Production 3,800,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,340 1,814,784
kWh
Electricity Demand $73,516 10,559
kW-mo/yr
Electricity Fees $5,712 -
Natural Gas $19,237 2,061
MMBtu
TOTAL YEARLY COSTS $296,805
RECOMMENDED SAVINGS* $9,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2122: Install / repair insulation on condensate lines $2,549 $2,836 - - - $2,549
-
MMBtu
02 2.5122: Replace high resistance ducts, pipes, and fittings $2,464 $500 $2,464
22,604
kWh
- - -
03 2.7135: Install occupancy sensors $2,272 $1,450 $2,272
20,848
kWh
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $917 $960 $190
(-327)
kWh
$727
-
kW-mo/yr
- -
05 2.7314: Reduce ventilation air $754 $3,000 - - - $754
-
MMBtu
06 2.8123: Pay utility bills on time $672 $500 - - $672 -
TOTAL RECOMMENDED $9,628 $9,246 $4,926
43,125
kWh
$727
-
kW-mo/yr
$672 $3,303
-
MMBtu
TOTAL IMPLEMENTED $8,874 $6,246 $4,926
43,125
kWh
$727
-
kW-mo/yr
$672 $2,549
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs