Assessment Year | 2016 |
---|---|
Principal Product | Treated drinking water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $10 M to 50M |
# of Employees | 9 |
Plant Area |
80,000
ft2
|
Annual Production | 3,800,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,340 | 1,814,784 |
kWh
|
$0.11 |
Electricity Demand | $73,516 | 10,559 |
kW-mo/yr
|
$6.96 |
Electricity Fees | $5,712 | - |
|
- |
Natural Gas | $19,237 | 2,061 |
MMBtu
|
$9.33 |
TOTAL YEARLY COSTS | $296,805 | |||
RECOMMENDED SAVINGS* | $9,628 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,874 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2122: Install / repair insulation on condensate lines | $2,549 | $2,836 | - | - | - |
$2,549
-
MMBtu
|
|
02 | 2.5122: Replace high resistance ducts, pipes, and fittings | $2,464 | $500 |
$2,464
22,604
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $2,272 | $1,450 |
$2,272
20,848
kWh
|
- | - | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $917 | $960 |
$190
(-327)
kWh
|
$727
-
kW-mo/yr
|
- | - | |
05 | 2.7314: Reduce ventilation air | $754 | $3,000 | - | - | - |
$754
-
MMBtu
|
|
06 | 2.8123: Pay utility bills on time | $672 | $500 | - | - | $672 | - | |
TOTAL RECOMMENDED | $9,628 | $9,246 |
$4,926
43,125
kWh
|
$727
-
kW-mo/yr
|
$672 |
$3,303
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,874 | $6,246 |
$4,926
43,125
kWh
|
$727
-
kW-mo/yr
|
$672 |
$2,549
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs