ITAC Assessment: SD0261
ITAC logo
ITAC Assessment: SD0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product metal parts for automobile industry
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 80,000
ft2
Annual Production 900
ton
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,023 4,625,850
kWh
Electricity Demand $92,639 9,058
kW-mo/yr
Electricity Fees $3,588 -
Natural Gas $31,720 5,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2425: Use flue gases to heat process or service water $4,061 $10,250 - $4,061
-
MMBtu
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $4,459 $4,000 - $4,459
-
MMBtu
- - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,320 - $12,600
-
kW-mo/yr
- - - - $4,720
04 2.3134: Shift from daytime to nighttime operation $2,492 - $1,728
-
kW-mo/yr
- - - - $764
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,500 $7,900 - - - - $4,500 -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,850 $2,100 - - - - $4,850 -
07 3.8121: Cover containers to minimize evaporative losses $8,708 $15,000 - - $8,708
-
gal
- - -
08 2.8114: Change rate schedules or other changes in utility service $59,514 - - - - - - $59,514
09 4.445: Install equipment to move product $14,400 $25,000 - - - $14,400 - -
10 4.821: Pay bills on time to avoid late fees $1,058 - - - - - $1,058 -
TOTAL RECOMMENDED $121,362 $64,250 $14,328
-
kW-mo/yr
$8,520
-
MMBtu
$8,708
-
gal
$14,400 $10,408 $64,998
TOTAL IMPLEMENTED $80,384 - $14,328
-
kW-mo/yr
- - - $1,058 $64,998
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs