Assessment Year | 2015 |
---|---|
Principal Product | aluminum cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $100 M to 500M |
# of Employees | 215 |
Plant Area |
290,000
ft2
|
Annual Production | 3,360,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,782,265 | 35,397,773 |
kWh
|
$0.079 |
Natural Gas | $805,178 | 189,009 |
MMBtu
|
$4.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $207,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,165 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $87,976 | $186,150 |
$87,976
1,119,286
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,566 | $37,930 |
$45,566
579,724
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,599 | $47,900 |
$37,599
478,358
kWh
|
- | |
04 | 2.7314: Reduce ventilation air | $16,956 | $9,990 |
$10,535
134,042
kWh
|
$6,421
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,878 | $100 |
$14,878
189,286
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,894 | $203 |
$2,894
36,815
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,691 | $4,785 |
$1,691
21,513
kWh
|
- | |
TOTAL RECOMMENDED | $207,560 | $287,058 |
$201,139
2,559,024
kWh
|
$6,421
-
MMBtu
|
||
TOTAL IMPLEMENTED | $83,165 | $85,830 |
$83,165
1,058,082
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs