ITAC Assessment: MA0752
ITAC logo
ITAC Assessment: MA0752
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aluminum cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 215
Plant Area 290,000
ft2
Annual Production 3,360,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,782,265 35,397,773
kWh
Natural Gas $805,178 189,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $87,976 $186,150 $87,976
1,119,286
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,566 $37,930 $45,566
579,724
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,599 $47,900 $37,599
478,358
kWh
-
04 2.7314: Reduce ventilation air $16,956 $9,990 $10,535
134,042
kWh
$6,421
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,878 $100 $14,878
189,286
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,894 $203 $2,894
36,815
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,691 $4,785 $1,691
21,513
kWh
-
TOTAL RECOMMENDED $207,560 $287,058 $201,139
2,559,024
kWh
$6,421
-
MMBtu
TOTAL IMPLEMENTED $83,165 $85,830 $83,165
1,058,082
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs