ITAC Assessment: MA0751
ITAC logo
ITAC Assessment: MA0751
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product printed paper
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 850
Plant Area 1,030,000
ft2
Annual Production 2,109,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,885,950 53,163,036
kWh
Electricity Demand $822,003 106,236
kW-mo/yr
Electricity Fees $48,652 -
Natural Gas $1,020,736 212,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,219 $62,146 $61,219
1,127,423
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $23,851 $1,000 $23,851
439,254
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,586 $11,250 $10,586
194,952
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,896 $7,732 $4,896
90,158
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,414 $500 $3,414
60,744
kWh
TOTAL RECOMMENDED $103,966 $82,628 $103,966
1,912,531
kWh
TOTAL IMPLEMENTED $76,701 $81,128 $76,701
1,412,533
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs