ITAC Assessment: MA0750
ITAC logo
ITAC Assessment: MA0750
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Medical instruments
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 60,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 4,394
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,509 1,492,400
kWh
Electricity Demand $26,709 3,962
kW-mo/yr
Electricity Fees $6,600 -
Fuel Oil #2 $128,168 4,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7314: Reduce ventilation air $18,184 $10,420 $409
3,121
kWh
$17,775
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $16,398 $7,000 $8,074
61,637
kWh
$8,324
-
MMBtu
03 2.7314: Reduce ventilation air $15,229 $15,000 $3,389
25,867
kWh
$11,840
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $6,208 $3,000 $6,208
47,392
kWh
-
05 2.1116: Improve combustion control capability $5,289 $2,500 - $5,289
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,138 $9,144 $3,138
23,956
kWh
-
07 2.2136: Install / repair insulation on steam lines $3,007 $1,500 - $3,007
-
MMBtu
08 2.6218: Turn off equipment when not in use $537 $100 - $537
-
MMBtu
TOTAL RECOMMENDED $67,990 $48,664 $21,218
161,973
kWh
$46,772
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs