Assessment Year | 2015 |
---|---|
Principal Product | Medical instruments |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 98 |
Plant Area |
60,000
ft2
|
Annual Production | 24,000
pieces
|
Production Hrs. Annual | 4,394
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,509 | 1,492,400 |
kWh
|
$0.13 |
Electricity Demand | $26,709 | 3,962 |
kW-mo/yr
|
$6.74 |
Electricity Fees | $6,600 | - |
|
- |
Fuel Oil #2 | $128,168 | 4,773 |
MMBtu
|
$26.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $18,184 | $10,420 |
$409
3,121
kWh
|
$17,775
-
MMBtu
|
|
02 | 2.7224: Reduce space conditioning during non-working hours | $16,398 | $7,000 |
$8,074
61,637
kWh
|
$8,324
-
MMBtu
|
|
03 | 2.7314: Reduce ventilation air | $15,229 | $15,000 |
$3,389
25,867
kWh
|
$11,840
-
MMBtu
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $6,208 | $3,000 |
$6,208
47,392
kWh
|
- | |
05 | 2.1116: Improve combustion control capability | $5,289 | $2,500 | - |
$5,289
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,138 | $9,144 |
$3,138
23,956
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $3,007 | $1,500 | - |
$3,007
-
MMBtu
|
|
08 | 2.6218: Turn off equipment when not in use | $537 | $100 | - |
$537
-
MMBtu
|
|
TOTAL RECOMMENDED | $67,990 | $48,664 |
$21,218
161,973
kWh
|
$46,772
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs