Assessment Year | 2015 |
---|---|
Principal Product | Lighting fixtures |
NAICS | 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $5 M to 10M |
# of Employees | 385 |
Plant Area |
315,000
ft2
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 2,522
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $655,278 | 5,759,778 |
kWh
|
$0.11 |
Electricity Demand | $118,309 | 21,552 |
kW-mo/yr
|
$5.49 |
Electricity Fees | $(-1,123.0) | - |
|
- |
Natural Gas | $631,714 | 47,704 |
MMBtu
|
$13.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,521 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $90,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $30,757 | $20,400 |
$21,583
189,659
kWh
|
- |
$9,174
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $24,207 | $1,000 |
$24,207
212,716
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,980 | $3,330 |
$17,980
157,997
kWh
|
- | - | |
04 | 2.3212: Optimize plant power factor | $10,366 | $25,300 | - |
$10,366
-
kW-mo/yr
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $8,523 | $1,000 |
$1,659
14,575
kWh
|
- |
$6,864
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,856 | $24,500 |
$6,856
60,242
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,067 | $3,000 |
$6,067
53,315
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,495 | $500 |
$2,495
21,927
kWh
|
- | - | |
09 | 2.6218: Turn off equipment when not in use | $3,372 | $1,000 |
$3,372
29,635
kWh
|
- | - | |
10 | 2.6121: Reduce hot water temperature to the minimum required | $1,592 | $500 | - | - |
$1,592
-
MMBtu
|
|
11 | 2.2136: Install / repair insulation on steam lines | $1,227 | $1,013 | - | - |
$1,227
-
MMBtu
|
|
12 | 2.6218: Turn off equipment when not in use | $1,079 | $100 |
$400
3,518
kWh
|
- |
$679
-
MMBtu
|
|
TOTAL RECOMMENDED | $114,521 | $81,643 |
$84,619
743,584
kWh
|
$10,366
-
kW-mo/yr
|
$19,536
-
MMBtu
|
||
TOTAL IMPLEMENTED | $90,318 | $53,330 |
$80,465
707,082
kWh
|
- |
$9,853
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs