ITAC Assessment: MA0749
ITAC logo
ITAC Assessment: MA0749
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Lighting fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $5
M
to 10
M
# of Employees 385
Plant Area 315,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 2,522
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $655,278 5,759,778
kWh
Electricity Demand $118,309 21,552
kW-mo/yr
Electricity Fees $(-1,123.0) -
Natural Gas $631,714 47,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $30,757 $20,400 $21,583
189,659
kWh
- $9,174
-
MMBtu
02 2.6218: Turn off equipment when not in use $24,207 $1,000 $24,207
212,716
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,980 $3,330 $17,980
157,997
kWh
- -
04 2.3212: Optimize plant power factor $10,366 $25,300 - $10,366
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $8,523 $1,000 $1,659
14,575
kWh
- $6,864
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,856 $24,500 $6,856
60,242
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,067 $3,000 $6,067
53,315
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,495 $500 $2,495
21,927
kWh
- -
09 2.6218: Turn off equipment when not in use $3,372 $1,000 $3,372
29,635
kWh
- -
10 2.6121: Reduce hot water temperature to the minimum required $1,592 $500 - - $1,592
-
MMBtu
11 2.2136: Install / repair insulation on steam lines $1,227 $1,013 - - $1,227
-
MMBtu
12 2.6218: Turn off equipment when not in use $1,079 $100 $400
3,518
kWh
- $679
-
MMBtu
TOTAL RECOMMENDED $114,521 $81,643 $84,619
743,584
kWh
$10,366
-
kW-mo/yr
$19,536
-
MMBtu
TOTAL IMPLEMENTED $90,318 $53,330 $80,465
707,082
kWh
- $9,853
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs