ITAC Assessment: GT0587
ITAC logo
ITAC Assessment: GT0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Flexible Packaging
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 35,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,673 1,645,662
kWh
Electricity Demand $53,597 3,334
kW-mo/yr
Electricity Fees $8,452 -
Natural Gas $55,211 11,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,734

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $10,034 - - - $10,034 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,400 $14,090 $2,033
86,460
kWh
$3,129
-
kW-mo/yr
$238 - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $480 - - $451
-
kW-mo/yr
$29 - - -
04 2.2437: Recover waste heat from equipment $23,230 $31,000 - - - $23,230
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,340 $7,000 $1,421
60,375
kWh
$1,734
-
kW-mo/yr
$185 - - -
06 3.8121: Cover containers to minimize evaporative losses $7,300 $503 - - - - $1,300
-
gal
$6,000
TOTAL RECOMMENDED $49,784 $52,593 $3,454
146,835
kWh
$5,314
-
kW-mo/yr
$10,486 $23,230
-
MMBtu
$1,300
-
gal
$6,000
TOTAL IMPLEMENTED $22,734 $14,593 $2,033
86,460
kWh
$3,129
-
kW-mo/yr
$10,272 - $1,300
-
gal
$6,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs