ITAC Assessment: MA0747
ITAC logo
ITAC Assessment: MA0747
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and English Muffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 328
Plant Area 535,000
ft2
Annual Production 180,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,040,238 22,176,000
kWh
Electricity Demand $438,933 38,940
kW-mo/yr
Electricity Fees $52,714 -
Natural Gas $1,375,451 181,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $115,415 $139,825 $115,415
1,251,579
kWh
- -
02 2.2437: Recover waste heat from equipment $77,983 $96,200 - - $77,983
-
MMBtu
03 2.3212: Optimize plant power factor $28,243 $56,115 - $28,243
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,522 $25,975 $24,522
266,545
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $22,316 $39,390 $22,316
242,568
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,793 $25,975 $6,793
73,840
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,525 $4,235 $4,525
49,184
kWh
- -
TOTAL RECOMMENDED $279,797 $387,715 $173,571
1,883,716
kWh
$28,243
-
kW-mo/yr
$77,983
-
MMBtu
TOTAL IMPLEMENTED $35,840 $56,185 $35,840
389,569
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs