Assessment Year | 2015 |
---|---|
Principal Product | Bread and English Muffins |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 328 |
Plant Area |
535,000
ft2
|
Annual Production | 180,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,040,238 | 22,176,000 |
kWh
|
$0.092 |
Electricity Demand | $438,933 | 38,940 |
kW-mo/yr
|
$11.27 |
Electricity Fees | $52,714 | - |
|
- |
Natural Gas | $1,375,451 | 181,699 |
MMBtu
|
$7.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $279,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,840 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $115,415 | $139,825 |
$115,415
1,251,579
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $77,983 | $96,200 | - | - |
$77,983
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $28,243 | $56,115 | - |
$28,243
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,522 | $25,975 |
$24,522
266,545
kWh
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $22,316 | $39,390 |
$22,316
242,568
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,793 | $25,975 |
$6,793
73,840
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,525 | $4,235 |
$4,525
49,184
kWh
|
- | - | |
TOTAL RECOMMENDED | $279,797 | $387,715 |
$173,571
1,883,716
kWh
|
$28,243
-
kW-mo/yr
|
$77,983
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,840 | $56,185 |
$35,840
389,569
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs