ITAC Assessment: MA0737
ITAC logo
ITAC Assessment: MA0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Composite parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 18,000
ft2
Annual Production 16
pieces
Production Hrs. Annual 5,279
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,229 1,059,120
kWh
Electricity Demand $67,062 4,214
kW-mo/yr
Electricity Fees $15,514 -
Natural Gas $6,131 479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $11,551 $200 - $11,551
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,120 $8,225 $7,120
65,437
kWh
-
03 2.1113: Reduce combustion air flow to optimum $1,931 $4,020 $1,931
17,751
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $551 $1,688 $551
5,068
kWh
-
TOTAL RECOMMENDED $21,153 $14,133 $9,602
88,256
kWh
$11,551
TOTAL IMPLEMENTED $19,222 $10,113 $7,671
70,505
kWh
$11,551
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs