| Assessment Year | 2014 |
|---|---|
| Principal Product | Electroplated parts |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 49 |
| Plant Area |
70,000
ft2
|
| Annual Production | 40,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $211,769 | 2,753,280 |
kWh
|
$0.077 |
| Electricity Demand | $101,028 | 9,054 |
kW-mo/yr
|
$11.16 |
| Electricity Fees | $(-9,566.0) | - |
|
- |
| Natural Gas | $267,906 | 34,342 |
MMBtu
|
$7.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,233 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $23,815 | $17,955 | - |
$23,815
-
kW-mo/yr
|
- | - | |
| 02 | 2.2136: Install / repair insulation on steam lines | $3,745 | $3,519 | - | - |
$3,745
-
MMBtu
|
- | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $3,084 | $500 | - | - | - | $3,084 | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,027 | $3,000 |
$1,027
13,354
kWh
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,377 | $4,200 |
$1,377
17,901
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $33,048 | $29,174 |
$2,404
31,255
kWh
|
$23,815
-
kW-mo/yr
|
$3,745
-
MMBtu
|
$3,084 | ||
| TOTAL IMPLEMENTED | $9,233 | $11,219 |
$2,404
31,255
kWh
|
- |
$3,745
-
MMBtu
|
$3,084 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs