ITAC Assessment: MA0735
ITAC logo
ITAC Assessment: MA0735
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Electroplated parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 70,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,769 2,753,280
kWh
Electricity Demand $101,028 9,054
kW-mo/yr
Electricity Fees $(-9,566.0) -
Natural Gas $267,906 34,342
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,048 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $23,815 $17,955 - $23,815
-
kW-mo/yr
- -
02 2.2136: Install / repair insulation on steam lines $3,745 $3,519 - - $3,745
-
MMBtu
-
03 2.8114: Change rate schedules or other changes in utility service $3,084 $500 - - - $3,084
04 2.4239: Eliminate or reduce compressed air usage $1,027 $3,000 $1,027
13,354
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,377 $4,200 $1,377
17,901
kWh
- - -
TOTAL RECOMMENDED $33,048 $29,174 $2,404
31,255
kWh
$23,815
-
kW-mo/yr
$3,745
-
MMBtu
$3,084
TOTAL IMPLEMENTED $9,233 $11,219 $2,404
31,255
kWh
- $3,745
-
MMBtu
$3,084
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs