Assessment Year | 2014 |
---|---|
Principal Product | Tape rules and knife blades |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
450,000
ft2
|
Annual Production | 3,900,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,061,131 | 17,528,907 |
kWh
|
$0.061 |
Electricity Demand | $293,752 | 21,601 |
kW-mo/yr
|
$13.60 |
Electricity Fees | $16,349 | - |
|
- |
Natural Gas | $367,579 | 50,292 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $110,807 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $89,290 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $65,768 | $10,000 | - | - |
$65,768
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,616 | $71,100 |
$15,694
259,404
kWh
|
$6,922
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,971 | $1,800 |
$8,971
148,278
kWh
|
- | - | |
04 | 2.7314: Reduce ventilation air | $5,225 | $7,500 |
$525
8,683
kWh
|
- |
$4,700
-
MMBtu
|
|
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,595 | $13,800 |
$4,595
75,950
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,532 | $3,300 |
$2,532
41,856
kWh
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $906 | $1,800 | - | - |
$906
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $194 | $500 |
$194
3,213
kWh
|
- | - | |
TOTAL RECOMMENDED | $110,807 | $109,800 |
$32,511
537,384
kWh
|
$6,922
-
kW-mo/yr
|
$71,374
-
MMBtu
|
||
TOTAL IMPLEMENTED | $89,290 | $82,900 |
$15,694
259,404
kWh
|
$6,922
-
kW-mo/yr
|
$66,674
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs