ITAC Assessment: HO0202
ITAC logo
ITAC Assessment: HO0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Coated Glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 31,000
ft2
Annual Production 1,000,000
thousand feet
Production Hrs. Annual 2,750
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,591 2,572,685
kWh
Electricity Demand $68,273 17,835
kW-mo/yr
Electricity Fees $(-19,898.0) -
Natural Gas $20,232 2,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,728 $15,851 $4,749
58,617
kWh
$979
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,525 $45 $1,265
15,533
kWh
$260
-
kW-mo/yr
- -
03 2.2515: Use optimum thickness insulation $3,266 $1,190 $2,704
33,411
kWh
$562
-
kW-mo/yr
- -
04 2.7144: Install spectral reflectors / delamp $6,188 $2,475 - - - $6,188
05 4.423: Move product using mechanical means $840 $500 - - - $840
06 4.131: Modify process to reduce material use/cost $3,900 $4,000 - - - $3,900
07 3.1291: Eliminate practice of mixing waste streams $2,492 $350 - - $2,492
-
lb
-
TOTAL RECOMMENDED $23,939 $24,411 $8,718
107,561
kWh
$1,801
-
kW-mo/yr
$2,492
-
lb
$10,928
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs