Assessment Year | 2014 |
---|---|
Principal Product | Fine paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 106 |
Plant Area |
232,000
ft2
|
Annual Production | 22,000
ton
|
Production Hrs. Annual | 6,500
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $942,026 | 14,750,134 |
kWh
|
$0.064 |
Electricity Demand | $422,287 | 38,216 |
kW-mo/yr
|
$11.05 |
LPG | $143,333 | 9,816 |
MMBtu
|
$14.60 |
Fuel Oil #6 | $3,118,729 | 188,114 |
MMBtu
|
$16.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,544,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,114,753 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $1,049,475 | $2,750,000 | - | - |
$(-2,069,254.0)
-
MMBtu
|
- |
$3,118,729
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $263,264 | $594,880 |
$(-15,272.0)
(-174,340)
kWh
|
$(-5,934.0)
-
kW-mo/yr
|
- | - |
$324,470
-
MMBtu
|
$(-40,000.0) | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $77,937 | $10,000 |
$2,233
25,491
kWh
|
- | - | - |
$75,704
-
MMBtu
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $74,123 | $120,280 |
$(-4,248.0)
(-48,490)
kWh
|
$(-995.0)
-
kW-mo/yr
|
- |
$79,366
-
MMBtu
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $28,833 | $9,690 | - | - | - | - |
$28,833
-
MMBtu
|
- | |
06 | 2.4224: Upgrade controls on compressors | $23,788 | $9,000 |
$23,788
271,550
kWh
|
- | - | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,381 | $15,200 |
$6,381
72,844
kWh
|
- | - | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,977 | $12,270 |
$4,977
56,818
kWh
|
- | - | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,970 | $13,450 |
$4,970
56,733
kWh
|
- | - | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,314 | $10,600 |
$4,314
49,242
kWh
|
- | - | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,444 | $10,200 |
$3,444
39,312
kWh
|
- | - | - | - | - | |
12 | 2.2511: Insulate bare equipment | $3,366 | $30,760 | - | - | - | - |
$3,366
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,544,872 | $3,586,330 |
$30,587
349,160
kWh
|
$(-6,929.0)
-
kW-mo/yr
|
$(-2,069,254.0)
-
MMBtu
|
$79,366
-
MMBtu
|
$3,551,102
-
MMBtu
|
$(-40,000.0) | ||
TOTAL IMPLEMENTED | $1,114,753 | $2,822,320 |
$33,079
377,610
kWh
|
- |
$(-2,069,254.0)
-
MMBtu
|
- |
$3,150,928
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs