ITAC Assessment: MA0725
ITAC logo
ITAC Assessment: MA0725
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fine paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 106
Plant Area 232,000
ft2
Annual Production 22,000
ton
Production Hrs. Annual 6,500
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $942,026 14,750,134
kWh
Electricity Demand $422,287 38,216
kW-mo/yr
LPG $143,333 9,816
MMBtu
Fuel Oil #6 $3,118,729 188,114
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,544,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,114,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1331: Burn a less expensive grade of fuel $1,049,475 $2,750,000 - - $(-2,069,254.0)
-
MMBtu
- $3,118,729
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $263,264 $594,880 $(-15,272.0)
(-174,340)
kWh
$(-5,934.0)
-
kW-mo/yr
- - $324,470
-
MMBtu
$(-40,000.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $77,937 $10,000 $2,233
25,491
kWh
- - - $75,704
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $74,123 $120,280 $(-4,248.0)
(-48,490)
kWh
$(-995.0)
-
kW-mo/yr
- $79,366
-
MMBtu
- -
05 2.2136: Install / repair insulation on steam lines $28,833 $9,690 - - - - $28,833
-
MMBtu
-
06 2.4224: Upgrade controls on compressors $23,788 $9,000 $23,788
271,550
kWh
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,381 $15,200 $6,381
72,844
kWh
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,977 $12,270 $4,977
56,818
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,970 $13,450 $4,970
56,733
kWh
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,314 $10,600 $4,314
49,242
kWh
- - - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,444 $10,200 $3,444
39,312
kWh
- - - - -
12 2.2511: Insulate bare equipment $3,366 $30,760 - - - - $3,366
-
MMBtu
-
TOTAL RECOMMENDED $1,544,872 $3,586,330 $30,587
349,160
kWh
$(-6,929.0)
-
kW-mo/yr
$(-2,069,254.0)
-
MMBtu
$79,366
-
MMBtu
$3,551,102
-
MMBtu
$(-40,000.0)
TOTAL IMPLEMENTED $1,114,753 $2,822,320 $33,079
377,610
kWh
- $(-2,069,254.0)
-
MMBtu
- $3,150,928
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs