ITAC Assessment: MA0722
ITAC logo
ITAC Assessment: MA0722
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 74,000
ft2
Annual Production 5,456,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,081 3,497,760
kWh
Electricity Demand $93,194 6,101
kW-mo/yr
Electricity Fees $949 -
Fuel Oil #2 $106,420 3,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,296

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.3137: Use power during off-peak periods $11,298 $500 - $10,616
-
kW-mo/yr
- $682
02 2.4131: Size electric motors for peak operating efficiency $10,940 $1,500 $10,940
161,357
kWh
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $3,147 $9,900 - - $3,147
-
MMBtu
-
04 2.7314: Reduce ventilation air $2,443 $3,000 $55
816
kWh
- $2,388
-
MMBtu
-
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,818 $2,750 $160
2,369
kWh
- $1,658
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,742 $1,450 - - $1,742
-
MMBtu
-
07 2.7314: Reduce ventilation air $1,630 $3,750 - - $1,630
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $998 $200 $998
14,717
kWh
- - -
09 2.8123: Pay utility bills on time $949 $500 - - - $949
10 2.7135: Install occupancy sensors $599 $1,600 $599
8,830
kWh
- - -
TOTAL RECOMMENDED $35,564 $25,150 $12,752
188,089
kWh
$10,616
-
kW-mo/yr
$10,565
-
MMBtu
$1,631
TOTAL IMPLEMENTED $12,296 $700 $998
14,717
kWh
$10,616
-
kW-mo/yr
- $682
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs