ITAC Assessment: MA0711
ITAC logo
ITAC Assessment: MA0711
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Photochemicals, Radiation Cured Chemicals and Additives
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 37,000
ft2
Annual Production 130
ton
Production Hrs. Annual 4,335
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,800 1,292,127
kWh
Electricity Demand $53,203 4,498
kW-mo/yr
Electricity Fees $6,066 -
Natural Gas $68,752 5,030
MMBtu
Fuel Oil #2 $4,743 169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,618 $35,000 $17,618
167,473
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,430 $25,000 $7,063
67,141
kWh
$2,834
-
kW-mo/yr
$(-3,467.0)
-
MMBtu
03 2.2611: Moderate cooling tower outlet temperature $6,314 $14,000 $6,314
60,021
kWh
- -
04 2.2136: Install / repair insulation on steam lines $2,170 $2,000 - - $2,170
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,165 $4,055 $1,601
15,215
kWh
$564
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,697 $80,055 $32,596
309,850
kWh
$3,398
-
kW-mo/yr
$(-1,297.0)
-
MMBtu
TOTAL IMPLEMENTED $4,335 $6,055 $1,601
15,215
kWh
$564
-
kW-mo/yr
$2,170
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs