Assessment Year | 2013 |
---|---|
Principal Product | paper |
NAICS | 322122: Newsprint Mills |
SIC | 2621: Paper Mills |
Sales Range | $100 M to 500M |
# of Employees | 45 |
Plant Area |
148,200
ft2
|
Annual Production | 14,500,000
lb
|
Production Hrs. Annual | 6,912
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,212,507 | 13,375,760 |
kWh
|
$0.091 |
Electricity Demand | $256,841 | 30,403 |
kW-mo/yr
|
$8.45 |
Natural Gas | $251,560 | 37,659 |
MMBtu
|
$6.68 |
Other Energy | $508,277 | 40,500 |
MMBtu
|
$12.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $190,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,996 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $132,553 | $324,000 | - | - |
$132,553
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,966 | $10,580 |
$22,966
197,981
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,915 | $10,580 |
$15,915
137,200
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,884 | $7,500 |
$7,884
67,962
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,460 | $6,400 |
$6,460
55,692
kWh
|
- | - | |
06 | 2.4134: Replace electric motor with fossil fuel engine | $3,796 | $1,000 |
$28,732
247,689
kWh
|
$(-24,936.0)
-
MMBtu
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,115 | $2,705 |
$1,115
9,615
kWh
|
- | - | |
TOTAL RECOMMENDED | $190,689 | $362,765 |
$83,072
716,139
kWh
|
$(-24,936.0)
-
MMBtu
|
$132,553
-
MMBtu
|
||
TOTAL IMPLEMENTED | $39,996 | $23,865 |
$39,996
344,796
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs