ITAC Assessment: MA0707
ITAC logo
ITAC Assessment: MA0707
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Semiconductor industry capital equipment
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 32,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,793 894,800
kWh
Electricity Demand $9,927 2,456
kW-mo/yr
Electricity Fees $2,370 -
Natural Gas $137 16
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,613 $1,000 $18,837
190,084
kWh
$1,090
-
kW-mo/yr
$(-5,314.0)
-
MMBtu
02 2.6218: Turn off equipment when not in use $972 $200 $972
9,804
kWh
- -
03 2.7135: Install occupancy sensors $807 $1,840 $807
8,145
kWh
- -
04 2.3212: Optimize plant power factor $439 $3,057 - $439
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $412 $200 $412
4,157
kWh
- -
TOTAL RECOMMENDED $17,243 $6,297 $21,028
212,190
kWh
$1,529
-
kW-mo/yr
$(-5,314.0)
-
MMBtu
TOTAL IMPLEMENTED $15,997 $1,400 $20,221
204,045
kWh
$1,090
-
kW-mo/yr
$(-5,314.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs