ITAC Assessment: MA0704
ITAC logo
ITAC Assessment: MA0704
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Optical filters and OEM coating
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 56,000
ft2
Annual Production 250
ton
Production Hrs. Annual 6,864
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,136 3,442,587
kWh
Electricity Demand $43,802 11,174
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $14,145 1,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,055

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $10,351 $200 $10,351
102,390
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,747 $9,100 $7,747
76,630
kWh
-
03 2.2628: Utilize a less expensive cooling method $2,329 $5,680 $2,329
23,043
kWh
-
04 2.7314: Reduce ventilation air $2,055 $5,900 $1,107
10,958
kWh
$948
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $1,765 $500 $817
8,084
kWh
$948
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $601 $2,200 $601
5,941
kWh
-
TOTAL RECOMMENDED $24,848 $23,580 $22,952
227,046
kWh
$1,896
-
MMBtu
TOTAL IMPLEMENTED $2,055 $5,900 $1,107
10,958
kWh
$948
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs