ITAC Assessment: GT0620
ITAC logo
ITAC Assessment: GT0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Packaged Sausage
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 27,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,452 1,175,850
kWh
Electricity Demand $29,544 2,603
kW-mo/yr
Electricity Fees $3,046 -
Natural Gas $27,533 4,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,454 $1,200 $855
33,118
kWh
$518
-
kW-mo/yr
$81 - - -
02 2.2136: Install / repair insulation on steam lines $1,260 $1,870 - - - $1,260
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,270 $6,830 $2,963
114,302
kWh
$2,002
-
kW-mo/yr
$305 - - -
04 2.2515: Use optimum thickness insulation $390 $900 $228
8,792
kWh
$136
-
kW-mo/yr
$26 - - -
05 3.4154: Eliminate leaks in water lines and valves $55 $50 - - - $30
-
MMBtu
- $25
-
Tgal
06 4.112: Replace old machine with new automatic multi-station tool $9,546 $50,000 - - - $1,954
-
MMBtu
$7,500 $92
-
Tgal
TOTAL RECOMMENDED $17,975 $60,850 $4,046
156,212
kWh
$2,656
-
kW-mo/yr
$412 $3,244
-
MMBtu
$7,500 $117
-
Tgal
TOTAL IMPLEMENTED $5,325 $6,880 $2,963
114,302
kWh
$2,002
-
kW-mo/yr
$305 $30
-
MMBtu
- $25
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs