ITAC Assessment: MA0695
ITAC logo
ITAC Assessment: MA0695
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aircraft parts and eqipment
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 140,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,071 4,123,056
kWh
Electricity Demand $142,334 15,648
kW-mo/yr
Electricity Fees $11,400 -
Natural Gas $50,782 4,734
MMBtu
Fuel Oil #2 $46,283 2,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,687

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings
01 2.1331: Burn a less expensive grade of fuel $24,095 $20,000 - - $(-22,180.0)
-
MMBtu
$46,275
-
MMBtu
-
02 2.6218: Turn off equipment when not in use $22,626 $5,600 $20,908
202,794
kWh
$1,718
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $8,891 $200 $3,853
37,374
kWh
- $5,038
-
MMBtu
- -
04 2.2628: Utilize a less expensive cooling method $6,220 $11,500 $(-384.0)
(-3,729)
kWh
- - - $6,604
-
Tgal
05 2.3212: Optimize plant power factor $5,965 $10,975 - $5,965
-
kW-mo/yr
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $2,830 $1,000 $2,830
27,456
kWh
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,676 $1,000 $2,676
25,964
kWh
- - - -
08 2.7314: Reduce ventilation air $2,481 $5,375 $2,127
20,635
kWh
- $354
-
MMBtu
- -
09 2.7135: Install occupancy sensors $2,470 $7,725 $2,470
23,962
kWh
- - - -
10 2.2511: Insulate bare equipment $2,281 $2,630 $555
5,388
kWh
- $1,726
-
MMBtu
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,309 $1,260 $1,309
12,705
kWh
- - - -
12 2.4239: Eliminate or reduce compressed air usage $768 $510 $768
7,454
kWh
- - - -
TOTAL RECOMMENDED $82,612 $67,775 $37,112
360,003
kWh
$7,683
-
kW-mo/yr
$(-15,062.0)
-
MMBtu
$46,275
-
MMBtu
$6,604
-
Tgal
TOTAL IMPLEMENTED $47,687 $30,535 $28,362
275,108
kWh
$7,683
-
kW-mo/yr
$5,038
-
MMBtu
- $6,604
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs