Assessment Year | 2012 |
---|---|
Principal Product | Electrical Contacts |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
71,000
ft2
|
Annual Production | 210,000
lb
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $400,158 | 4,173,360 |
kWh
|
$0.096 |
Electricity Demand | $129,528 | 12,337 |
kW-mo/yr
|
$10.50 |
Natural Gas | $102,908 | 8,092 |
MMBtu
|
$12.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $12,023 | $500 |
$1,366
14,224
kWh
|
$10,657
-
MMBtu
|
|
02 | 2.7314: Reduce ventilation air | $7,473 | - |
$3,340
34,802
kWh
|
$4,133
-
MMBtu
|
|
03 | 2.2312: Minimize non-essential material in heat treatment process | $5,619 | - |
$5,619
58,535
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $3,042 | $665 |
$3,042
31,695
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $2,300 | $16,608 |
$2,300
23,956
kWh
|
- | |
06 | 2.7496: Install partitions to reduce size of conditioned space | $1,515 | $3,410 |
$1,515
15,782
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $503 | $900 |
$503
5,238
kWh
|
- | |
08 | 2.4323: Use optimum size and capacity equipment | $253 | $900 |
$253
2,637
kWh
|
- | |
TOTAL RECOMMENDED | $32,728 | $22,983 |
$17,938
186,869
kWh
|
$14,790
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,445 | $18,008 |
$9,788
101,953
kWh
|
$10,657
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs