ITAC Assessment: MA0694
ITAC logo
ITAC Assessment: MA0694
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Electrical Contacts
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 71,000
ft2
Annual Production 210,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,158 4,173,360
kWh
Electricity Demand $129,528 12,337
kW-mo/yr
Natural Gas $102,908 8,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $12,023 $500 $1,366
14,224
kWh
$10,657
-
MMBtu
02 2.7314: Reduce ventilation air $7,473 - $3,340
34,802
kWh
$4,133
-
MMBtu
03 2.2312: Minimize non-essential material in heat treatment process $5,619 - $5,619
58,535
kWh
-
04 2.2511: Insulate bare equipment $3,042 $665 $3,042
31,695
kWh
-
05 2.2511: Insulate bare equipment $2,300 $16,608 $2,300
23,956
kWh
-
06 2.7496: Install partitions to reduce size of conditioned space $1,515 $3,410 $1,515
15,782
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $503 $900 $503
5,238
kWh
-
08 2.4323: Use optimum size and capacity equipment $253 $900 $253
2,637
kWh
-
TOTAL RECOMMENDED $32,728 $22,983 $17,938
186,869
kWh
$14,790
-
MMBtu
TOTAL IMPLEMENTED $20,445 $18,008 $9,788
101,953
kWh
$10,657
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs