ITAC Assessment: MA0693
ITAC logo
ITAC Assessment: MA0693
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Power supplies, AD converters and panel meters
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 249
Plant Area 180,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $588,953 5,637,600
kWh
Electricity Demand $126,231 12,437
kW-mo/yr
Electricity Fees $240 -
Natural Gas $23,893 4,292
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.8123: Pay utility bills on time $25,247 $500 - $25,247 -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $15,776 $43,000 $15,776
335,650
kWh
- -
03 2.2135: Repair and eliminate steam leaks $9,000 $4,200 $9,000
191,494
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $6,573 $27,000 $6,573
139,860
kWh
- -
05 2.7135: Install occupancy sensors $1,572 $4,200 $1,572
33,437
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $486 $200 $486
10,344
kWh
- -
07 2.2511: Insulate bare equipment $373 $600 - - $373
-
MMBtu
TOTAL RECOMMENDED $59,027 $79,700 $33,407
710,785
kWh
$25,247 $373
-
MMBtu
TOTAL IMPLEMENTED $35,819 $8,900 $10,572
224,931
kWh
$25,247 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs