ITAC Assessment: MA0688
ITAC logo
ITAC Assessment: MA0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,030
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,837 1,836,000
kWh
Electricity Demand $44,928 4,992
kW-mo/yr
Electricity Fees $120 -
Natural Gas $271,688 21,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $22,622 $21,500 $11,345
119,930
kWh
$11,277
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $10,004 $9,352 - $10,004
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $2,644 $2,250 $(-228.0)
(-2,409)
kWh
$2,872
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,988 $1,800 $1,988
21,024
kWh
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $1,762 $15,050 $1,762
18,636
kWh
-
06 2.7135: Install occupancy sensors $1,689 $4,605 $1,689
17,853
kWh
-
TOTAL RECOMMENDED $40,709 $54,557 $16,556
175,034
kWh
$24,153
-
MMBtu
TOTAL IMPLEMENTED $14,337 $16,207 $1,461
15,444
kWh
$12,876
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs