ITAC Assessment: MA0681
ITAC logo
ITAC Assessment: MA0681
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Extruded plastic
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 44,000
ft2
Annual Production 325
ton
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,738 1,578,960
kWh
Electricity Demand $49,371 3,974
kW-mo/yr
Electricity Fees $4,800 -
Natural Gas $37,540 2,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $6,162 $9,261 $4,709
38,384
kWh
$1,453
-
MMBtu
02 2.4237: Substitute compressed air cooling with water or air cooling $1,294 $1,220 $1,294
10,548
kWh
-
03 2.7135: Install occupancy sensors $1,163 $1,265 $1,163
9,480
kWh
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $768 $300 $768
6,262
kWh
-
05 2.2511: Insulate bare equipment $152 $80 $152
1,236
kWh
-
TOTAL RECOMMENDED $9,539 $12,126 $8,086
65,910
kWh
$1,453
-
MMBtu
TOTAL IMPLEMENTED $7,325 $10,526 $5,872
47,864
kWh
$1,453
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs