Assessment Year | 2006 |
---|---|
Principal Product | Pressure vessels and industrial control panels |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
120,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 2,525
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,599 | 1,442,000 |
kWh
|
$0.095 |
Electricity Demand | $15,744 | 5,011 |
kW-mo/yr
|
$3.14 |
Electricity Fees | $2,112 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $10,035 | $10,765 | - |
$10,035
-
kW-mo/yr
|
- | - | |
02 | 2.7145: Install skylights | $8,850 | $20,715 |
$10,140
130,000
kWh
|
- | $(-1,290.0) | - | |
03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $5,660 | $220 | - | - | - | $5,660 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,555 | $8,630 |
$2,875
36,870
kWh
|
$2,350
-
kW-mo/yr
|
- | $330 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,260 | $25 |
$2,350
30,100
kWh
|
$1,910
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $950 | $250 |
$520
6,660
kWh
|
$430
-
kW-mo/yr
|
- | - | |
07 | 3.7132: Reuse rags until completely soiled | $600 | - | - | - | - | $600 | |
TOTAL RECOMMENDED | $35,910 | $40,605 |
$15,885
203,630
kWh
|
$14,725
-
kW-mo/yr
|
$(-1,290.0) | $6,590 | ||
TOTAL IMPLEMENTED | $20,800 | $19,670 |
$5,745
73,630
kWh
|
$14,725
-
kW-mo/yr
|
- | $330 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs