ITAC Assessment: MA0680
ITAC logo
ITAC Assessment: MA0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Data loggers
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 40,500
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,161 674,360
kWh
Electricity Demand $14,103 2,227
kW-mo/yr
Electricity Fees $5,035 -
Natural Gas $7,176 576
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $5,371 $45,123 $5,371
45,675
kWh
-
02 2.7314: Reduce ventilation air $3,229 $2,895 $1,553
13,208
kWh
$1,676
-
MMBtu
03 2.7314: Reduce ventilation air $630 $2,895 $258
2,197
kWh
$372
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $265 $2,000 $265
2,260
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $151 - $151
1,284
kWh
-
TOTAL RECOMMENDED $9,646 $52,913 $7,598
64,624
kWh
$2,048
-
MMBtu
TOTAL IMPLEMENTED $9,381 $50,913 $7,333
62,364
kWh
$2,048
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs