ITAC Assessment: MA0678
ITAC logo
ITAC Assessment: MA0678
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Steel Investment castings
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 110,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $972,900 9,002,755
kWh
Electricity Demand $177,973 22,560
kW-mo/yr
Electricity Fees $960 -
Natural Gas $339,899 35,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,383 $88,700 $27,383
270,045
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,204 $5,760 $21,204
209,118
kWh
03 2.6218: Turn off equipment when not in use $9,343 - $9,343
92,144
kWh
04 2.6218: Turn off equipment when not in use $7,186 - $7,186
70,873
kWh
05 2.2622: Replace existing chiller with high efficiency model $6,819 $26,495 $6,819
67,249
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,833 $8,590 $5,833
57,520
kWh
TOTAL RECOMMENDED $77,768 $129,545 $77,768
766,949
kWh
TOTAL IMPLEMENTED $65,116 $94,460 $65,116
642,180
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs