| Assessment Year | 2011 |
|---|---|
| Principal Product | cable manufacturing |
| NAICS | 335921: Fiber Optic Cable Manufacturing |
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
180,000
ft2
|
| Annual Production | 40,000
thousand feet
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $415,944 | 3,834,000 |
kWh
|
$0.11 |
| Electricity Demand | $29,772 | 7,595 |
kW-mo/yr
|
$3.92 |
| Electricity Fees | $2,400 | - |
|
- |
| Natural Gas | $58,712 | 5,945 |
MMBtu
|
$9.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $11,498 | $17,900 |
$11,498
100,769
kWh
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $6,531 | $19,965 |
$(-2,638.0)
(-23,126)
kWh
|
$9,169
-
MMBtu
|
|
| 03 | 2.7314: Reduce ventilation air | $2,652 | $1,200 | - |
$2,652
-
MMBtu
|
|
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $2,323 | $14,500 | - |
$2,323
-
MMBtu
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $941 | $6,225 |
$941
8,249
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $670 | $2,150 |
$670
5,878
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $434 | $1,400 | - |
$434
-
MMBtu
|
|
| TOTAL RECOMMENDED | $25,049 | $63,340 |
$10,471
91,770
kWh
|
$14,578
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs