ITAC Assessment: MA0674
ITAC logo
ITAC Assessment: MA0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product cable manufacturing
NAICS 335921: Fiber Optic Cable Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 180,000
ft2
Annual Production 40,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,944 3,834,000
kWh
Electricity Demand $29,772 7,595
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $58,712 5,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2628: Utilize a less expensive cooling method $11,498 $17,900 $11,498
100,769
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $6,531 $19,965 $(-2,638.0)
(-23,126)
kWh
$9,169
-
MMBtu
03 2.7314: Reduce ventilation air $2,652 $1,200 - $2,652
-
MMBtu
04 2.7232: Replace existing hvac unit with high efficiency model $2,323 $14,500 - $2,323
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $941 $6,225 $941
8,249
kWh
-
06 2.7135: Install occupancy sensors $670 $2,150 $670
5,878
kWh
-
07 2.2511: Insulate bare equipment $434 $1,400 - $434
-
MMBtu
TOTAL RECOMMENDED $25,049 $63,340 $10,471
91,770
kWh
$14,578
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs