Assessment Year | 2011 |
---|---|
Principal Product | Pharmaceutical compounds |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 56 |
Plant Area |
120,000
ft2
|
Annual Production | 10,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $366,724 | 4,655,968 |
kWh
|
$0.079 |
Electricity Demand | $92,552 | 10,693 |
kW-mo/yr
|
$8.66 |
Natural Gas | $299,954 | 20,541 |
MMBtu
|
$14.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,561 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,492 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $128,581 | $1,577,500 |
$364,520
3,877,870
kWh
|
$(-235,939.0)
-
MMBtu
|
|
02 | 2.7241: Install outside air damper / economizer on hvac unit | $8,255 | $8,150 |
$8,255
87,823
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,909 | $6,850 |
$7,909
84,136
kWh
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $5,324 | $14,800 |
$5,324
56,642
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,965 | $3,935 |
$1,965
20,911
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,777 | $8,300 |
$1,777
18,905
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $1,750 | - |
$1,750
18,606
kWh
|
- | |
TOTAL RECOMMENDED | $155,561 | $1,619,535 |
$391,500
4,164,893
kWh
|
$(-235,939.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,492 | $12,235 |
$5,492
58,422
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs