ITAC Assessment: MA0672
ITAC logo
ITAC Assessment: MA0672
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Pharmaceutical compounds
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 56
Plant Area 120,000
ft2
Annual Production 10,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,724 4,655,968
kWh
Electricity Demand $92,552 10,693
kW-mo/yr
Natural Gas $299,954 20,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $128,581 $1,577,500 $364,520
3,877,870
kWh
$(-235,939.0)
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $8,255 $8,150 $8,255
87,823
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,909 $6,850 $7,909
84,136
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $5,324 $14,800 $5,324
56,642
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,965 $3,935 $1,965
20,911
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,777 $8,300 $1,777
18,905
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $1,750 - $1,750
18,606
kWh
-
TOTAL RECOMMENDED $155,561 $1,619,535 $391,500
4,164,893
kWh
$(-235,939.0)
-
MMBtu
TOTAL IMPLEMENTED $5,492 $12,235 $5,492
58,422
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs