ITAC Assessment: CO0555
ITAC logo
ITAC Assessment: CO0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Miscellaneous Steel Fabrication
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 120,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,968
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,299 2,382,480
kWh
Electricity Demand $52,532 6,566
kW-mo/yr
Electricity Fees $8,460 -
Natural Gas $163,846 24,701
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7244: Revise smoke cleanup from operations $4,790 $13,100 $(-2,310.0)
(-57,800)
kWh
$(-790.0)
-
kW-mo/yr
$7,890
-
MMBtu
- -
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $900 $580 - - $900
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $186 $260 $138
3,434
kWh
$48
-
kW-mo/yr
- - -
04 2.4131: Size electric motors for peak operating efficiency $220 $420 $220
5,600
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,890 $37,430 $12,250
306,200
kWh
$4,240
-
kW-mo/yr
- - $(-2,600.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,540 $4,990 $1,090
27,200
kWh
$1,030
-
kW-mo/yr
- $(-10.0) $430
07 2.7135: Install occupancy sensors $120 $390 $120
3,000
kWh
- - - -
TOTAL RECOMMENDED $22,646 $57,170 $11,508
287,634
kWh
$4,528
-
kW-mo/yr
$8,790
-
MMBtu
$(-10.0) $(-2,170.0)
TOTAL IMPLEMENTED $5,876 $13,940 $(-2,172.0)
(-54,366)
kWh
$(-742.0)
-
kW-mo/yr
$8,790
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs