Assessment Year | 2004 |
---|---|
Principal Product | Miscellaneous Steel Fabrication |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
120,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,968
hrs
|
Location (State) | North Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,299 | 2,382,480 |
kWh
|
$0.043 |
Electricity Demand | $52,532 | 6,566 |
kW-mo/yr
|
$8.00 |
Electricity Fees | $8,460 | - |
|
- |
Natural Gas | $163,846 | 24,701 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,876 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7244: Revise smoke cleanup from operations | $4,790 | $13,100 |
$(-2,310.0)
(-57,800)
kWh
|
$(-790.0)
-
kW-mo/yr
|
$7,890
-
MMBtu
|
- | - | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $900 | $580 | - | - |
$900
-
MMBtu
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $186 | $260 |
$138
3,434
kWh
|
$48
-
kW-mo/yr
|
- | - | - | |
04 | 2.4131: Size electric motors for peak operating efficiency | $220 | $420 |
$220
5,600
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,890 | $37,430 |
$12,250
306,200
kWh
|
$4,240
-
kW-mo/yr
|
- | - | $(-2,600.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,540 | $4,990 |
$1,090
27,200
kWh
|
$1,030
-
kW-mo/yr
|
- | $(-10.0) | $430 | |
07 | 2.7135: Install occupancy sensors | $120 | $390 |
$120
3,000
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $22,646 | $57,170 |
$11,508
287,634
kWh
|
$4,528
-
kW-mo/yr
|
$8,790
-
MMBtu
|
$(-10.0) | $(-2,170.0) | ||
TOTAL IMPLEMENTED | $5,876 | $13,940 |
$(-2,172.0)
(-54,366)
kWh
|
$(-742.0)
-
kW-mo/yr
|
$8,790
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs