Assessment Year | 2011 |
---|---|
Principal Product | Electrical Surface Mount Raceway |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
260,000
ft2
|
Annual Production | 20,400,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $691,392 | 6,202,173 |
kWh
|
$0.11 |
Electricity Demand | $240,779 | 17,244 |
kW-mo/yr
|
$13.96 |
Electricity Fees | $11,400 | - |
|
- |
Natural Gas | $247,015 | 22,491 |
MMBtu
|
$10.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,668 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,378 | $1,800 |
$8,378
75,140
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,899 | $11,500 |
$7,899
70,854
kWh
|
- | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,401 | $11,610 |
$3,401
30,503
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $3,004 | $3,750 | - |
$3,004
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,755 | $200 |
$2,755
24,711
kWh
|
- | |
06 | 2.4323: Use optimum size and capacity equipment | $1,802 | $7,000 |
$1,802
16,157
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $986 | $950 | - |
$986
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,225 | $36,810 |
$24,235
217,365
kWh
|
$3,990
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,668 | $29,610 |
$19,678
176,497
kWh
|
$3,990
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs