ITAC Assessment: MA0668
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Electrical Surface Mount Raceway
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 260,000
ft2
Annual Production 20,400,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $691,392 6,202,173
kWh
Electricity Demand $240,779 17,244
kW-mo/yr
Electricity Fees $11,400 -
Natural Gas $247,015 22,491
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,378 $1,800 $8,378
75,140
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $7,899 $11,500 $7,899
70,854
kWh
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $3,401 $11,610 $3,401
30,503
kWh
-
04 2.2511: Insulate bare equipment $3,004 $3,750 - $3,004
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,755 $200 $2,755
24,711
kWh
-
06 2.4323: Use optimum size and capacity equipment $1,802 $7,000 $1,802
16,157
kWh
-
07 2.2511: Insulate bare equipment $986 $950 - $986
-
MMBtu
TOTAL RECOMMENDED $28,225 $36,810 $24,235
217,365
kWh
$3,990
-
MMBtu
TOTAL IMPLEMENTED $23,668 $29,610 $19,678
176,497
kWh
$3,990
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs