Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Electrical connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $50
M
to 100
M
# of Employees 141
Plant Area 36,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,256 895,500
kWh
Electricity Demand $26,044 2,640
kW-mo/yr
Electricity Fees $(-7,039.0) -
Natural Gas $9,576 822
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,146 $5,990 $928
11,596
kWh
$1,218
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,085 $8,685 - $2,085
-
MMBtu
03 2.7131: Add area lighting switches $1,900 $500 $1,900
18,096
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $550 $200 $550
5,239
kWh
-
TOTAL RECOMMENDED $6,681 $15,375 $3,378
34,931
kWh
$3,303
-
MMBtu
TOTAL IMPLEMENTED $1,900 $500 $1,900
18,096
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs