ITAC Assessment: MA0664
ITAC logo
ITAC Assessment: MA0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Cooked meat products
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 335
Plant Area 170,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $992,426 12,899,600
kWh
Electricity Demand $727,242 36,158
kW-mo/yr
Electricity Fees $(-46,019.0) -
Natural Gas $971,815 106,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $137,654

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.3212: Optimize plant power factor $133,570 $55,950 - $133,570
-
kW-mo/yr
-
02 3.4151: Minimize water usage $26,438 $62,000 - - $26,438
-
Tgal
03 2.2621: Modify refrigeration system to operate at a lower pressure $25,051 $34,000 $25,051
325,764
kWh
- -
04 2.2622: Replace existing chiller with high efficiency model $17,890 $95,000 $17,890
232,650
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,874 $18,345 $6,874
89,385
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,084 $200 $4,084
53,112
kWh
- -
TOTAL RECOMMENDED $213,907 $265,495 $53,899
700,911
kWh
$133,570
-
kW-mo/yr
$26,438
-
Tgal
TOTAL IMPLEMENTED $137,654 $56,150 $4,084
53,112
kWh
$133,570
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs