| Assessment Year | 2010 |
|---|---|
| Principal Product | Metalizing and coating services |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 67 |
| Plant Area |
55,000
ft2
|
| Annual Production | 25,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $155,037 | 1,590,400 |
kWh
|
$0.097 |
| Electricity Demand | $17,274 | 4,203 |
kW-mo/yr
|
$4.11 |
| Natural Gas | $72,184 | 7,698 |
MMBtu
|
$9.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $938 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $22,896 | $90,000 | - | - |
$22,896
-
MMBtu
|
|
| 02 | 2.2622: Replace existing chiller with high efficiency model | $10,239 | $24,000 |
$9,483
95,792
kWh
|
$756
-
kW-mo/yr
|
- | |
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,990 | $21,410 |
$4,990
50,406
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $938 | $600 |
$938
9,197
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $900 | $200 |
$900
9,088
kWh
|
- | - | |
| TOTAL RECOMMENDED | $39,963 | $136,210 |
$16,311
164,483
kWh
|
$756
-
kW-mo/yr
|
$22,896
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $938 | $600 |
$938
9,197
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs