ITAC Assessment: MA0663
ITAC logo
ITAC Assessment: MA0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Metalizing and coating services
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 55,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,037 1,590,400
kWh
Electricity Demand $17,274 4,203
kW-mo/yr
Natural Gas $72,184 7,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $22,896 $90,000 - - $22,896
-
MMBtu
02 2.2622: Replace existing chiller with high efficiency model $10,239 $24,000 $9,483
95,792
kWh
$756
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $4,990 $21,410 $4,990
50,406
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $938 $600 $938
9,197
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $900 $200 $900
9,088
kWh
- -
TOTAL RECOMMENDED $39,963 $136,210 $16,311
164,483
kWh
$756
-
kW-mo/yr
$22,896
-
MMBtu
TOTAL IMPLEMENTED $938 $600 $938
9,197
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs