ITAC Assessment: MA0660
ITAC logo
ITAC Assessment: MA0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Silicon Carbide
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 80,000
ft2
Annual Production 12
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,845 3,399,800
kWh
Electricity Demand $56,349 13,913
kW-mo/yr
Electricity Fees $26,140 -
Natural Gas $3,831 227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,403 $9,546 $5,403
43,646
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,241 - $2,241
18,108
kWh
-
03 2.6218: Turn off equipment when not in use $58,587 - $58,587
473,240
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,601 $19,240 $13,973
112,871
kWh
$628
-
kW-mo/yr
05 2.2625: Chill water to the highest temperature possible $23,123 - $23,123
186,775
kWh
-
TOTAL RECOMMENDED $103,955 $28,786 $103,327
834,640
kWh
$628
-
kW-mo/yr
TOTAL IMPLEMENTED $87,113 $9,546 $87,113
703,661
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs