ITAC Assessment: MA0659
ITAC logo
ITAC Assessment: MA0659
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plastic moldings
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 53,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,238 2,175,360
kWh
Electricity Demand $34,442 6,026
kW-mo/yr
Electricity Fees $38,937 -
Natural Gas $12,248 884
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2622: Replace existing chiller with high efficiency model $35,538 $103,290 $35,538
358,972
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,141 $119,100 $31,626
319,457
kWh
$3,515
-
kW-mo/yr
03 2.2691: Shut off cooling if cold outside air will cool process $20,648 $35,545 $20,648
208,648
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,781 $7,735 $16,781
169,504
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,273 $1,800 $2,273
22,958
kWh
-
TOTAL RECOMMENDED $110,381 $267,470 $106,866
1,079,539
kWh
$3,515
-
kW-mo/yr
TOTAL IMPLEMENTED $72,952 $224,190 $69,437
701,387
kWh
$3,515
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs