Assessment Year | 2009 |
---|---|
Principal Product | Precision medical components |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
36,000
ft2
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,417 | 474,080 |
kWh
|
$0.13 |
Electricity Demand | $17,620 | 1,554 |
kW-mo/yr
|
$11.34 |
Electricity Fees | $15,808 | - |
|
- |
Natural Gas | $11,794 | 805 |
MMBtu
|
$14.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,997 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,779 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $5,218 | $10,000 |
$5,218
38,740
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $1,735 | - |
$1,735
13,614
kWh
|
- | - | |
03 | 2.7314: Reduce ventilation air | $581 | $2,300 |
$153
1,139
kWh
|
- |
$428
-
MMBtu
|
|
04 | 2.7314: Reduce ventilation air | $250 | - |
$250
1,970
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $213 | - |
$138
1,091
kWh
|
$75
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $7,997 | $12,300 |
$7,494
56,554
kWh
|
$75
-
kW-mo/yr
|
$428
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,779 | $2,300 |
$2,276
17,814
kWh
|
$75
-
kW-mo/yr
|
$428
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs