ITAC Assessment: MA0650
ITAC logo
ITAC Assessment: MA0650
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Precision medical components
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 36,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,417 474,080
kWh
Electricity Demand $17,620 1,554
kW-mo/yr
Electricity Fees $15,808 -
Natural Gas $11,794 805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,779

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $5,218 $10,000 $5,218
38,740
kWh
- -
02 2.6218: Turn off equipment when not in use $1,735 - $1,735
13,614
kWh
- -
03 2.7314: Reduce ventilation air $581 $2,300 $153
1,139
kWh
- $428
-
MMBtu
04 2.7314: Reduce ventilation air $250 - $250
1,970
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $213 - $138
1,091
kWh
$75
-
kW-mo/yr
-
TOTAL RECOMMENDED $7,997 $12,300 $7,494
56,554
kWh
$75
-
kW-mo/yr
$428
-
MMBtu
TOTAL IMPLEMENTED $2,779 $2,300 $2,276
17,814
kWh
$75
-
kW-mo/yr
$428
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs