| Assessment Year | 2009 |
|---|---|
| Principal Product | Desiccant Dehumidification Air Handlers |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 459 |
| Plant Area |
130,000
ft2
|
| Annual Production | 550
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $394,802 | 3,216,102 |
kWh
|
$0.12 |
| Electricity Fees | $1,213 | - |
|
- |
| Natural Gas | $131,023 | 9,722 |
MMBtu
|
$13.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,924 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $34,492 | $160,000 |
$31,802
258,978
kWh
|
$2,690
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,900 | - |
$12,900
105,000
kWh
|
- | |
| 03 | 2.7314: Reduce ventilation air | $11,580 | $25,000 | - |
$11,580
-
MMBtu
|
|
| 04 | 2.4323: Use optimum size and capacity equipment | $8,097 | $37,500 | - |
$8,097
-
MMBtu
|
|
| 05 | 2.7314: Reduce ventilation air | $6,015 | $2,600 |
$2,680
21,820
kWh
|
$3,335
-
MMBtu
|
|
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,937 | - | - |
$1,937
-
MMBtu
|
|
| TOTAL RECOMMENDED | $75,021 | $225,100 |
$47,382
385,798
kWh
|
$27,639
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $66,924 | $187,600 |
$47,382
385,798
kWh
|
$19,542
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs