ITAC Assessment: MA0641
ITAC logo
ITAC Assessment: MA0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product FLocked substrates
NAICS 313230: Nonwoven Fabric Mills
SIC 2297: Non-woven Fabrics
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 113,000
ft2
Annual Production 105,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,187 2,906,400
kWh
Electricity Demand $47,142 10,272
kW-mo/yr
Electricity Fees $840 -
Natural Gas $652,214 52,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $287,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $280,575 $3,040,000 $(-17,718.0)
(-186,500)
kWh
$(-2,046.0)
-
kW-mo/yr
$300,339
-
MMBtu
02 2.1392: Replace purchased steam with other energy source $3,484 $3,300 - - $3,484
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,028 $3,000 - - $3,028
-
MMBtu
TOTAL RECOMMENDED $287,087 $3,046,300 $(-17,718.0)
(-186,500)
kWh
$(-2,046.0)
-
kW-mo/yr
$306,851
-
MMBtu
TOTAL IMPLEMENTED $3,028 $3,000 - - $3,028
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs