ITAC Assessment: MA0631
ITAC logo
ITAC Assessment: MA0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Specialty papers
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 71,000
ft2
Annual Production 1,950
ton
Production Hrs. Annual 4,914
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,029 879,300
kWh
Electricity Demand $22,076 2,958
kW-mo/yr
Electricity Fees $3,924 -
Natural Gas $21,262 1,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,384 $27,090 $13,526
101,699
kWh
$1,858
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,021 - $894
6,873
kWh
$127
-
kW-mo/yr
03 2.6212: Turn off equipment during breaks, reduce operating time $609 - $609
4,576
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $350 $200 $350
2,693
kWh
-
TOTAL RECOMMENDED $17,364 $27,290 $15,379
115,841
kWh
$1,985
-
kW-mo/yr
TOTAL IMPLEMENTED $17,364 $27,290 $15,379
115,841
kWh
$1,985
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs