ITAC Assessment: MA0628
ITAC logo
ITAC Assessment: MA0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Steel products
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 46,782
ft2
Annual Production 109,000,000
pieces
Production Hrs. Annual 5,382
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,471 1,161,040
kWh
Electricity Demand $75,119 7,372
kW-mo/yr
LPG $67,771 3,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $10,924 $18,000 - - $10,924
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $4,555 $2,800 $4,555
41,000
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,591 $4,000 $2,153
19,375
kWh
$438
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $566 $2,285 $566
5,100
kWh
- -
05 2.2511: Insulate bare equipment $305 $290 $305
2,748
kWh
- -
TOTAL RECOMMENDED $18,941 $27,375 $7,579
68,223
kWh
$438
-
kW-mo/yr
$10,924
-
MMBtu
TOTAL IMPLEMENTED $18,375 $25,090 $7,013
63,123
kWh
$438
-
kW-mo/yr
$10,924
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs