ITAC Assessment: MA0626
ITAC logo
ITAC Assessment: MA0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Steel cast products
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 116,620
ft2
Annual Production 5,000
ton
Production Hrs. Annual 4,905
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,850 5,965,433
kWh
Electricity Demand $157,418 37,214
kW-mo/yr
Electricity Fees $46,155 -
Natural Gas $242,547 19,053
MMBtu
LPG $11,607 816
MMBtu
Fuel Oil #2 $43,244 2,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $67,278 $157,500 - - $67,278
-
MMBtu
-
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $6,543 $8,000 - - $6,543
-
MMBtu
-
03 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $5,346 - - - $5,346
-
MMBtu
-
04 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $3,465 $2,500 - - $7,065
-
MMBtu
$(-3,600.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,602 $5,481 $1,441
13,100
kWh
$161
-
kW-mo/yr
- -
06 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $395 $200 - - $395
-
MMBtu
-
TOTAL RECOMMENDED $84,629 $173,681 $1,441
13,100
kWh
$161
-
kW-mo/yr
$86,627
-
MMBtu
$(-3,600.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs