Assessment Year | 2007 |
---|---|
Principal Product | Watch & Electronic Batteries, Hearing Aid Batteries |
NAICS | 335912: Primary Battery Manufacturing |
SIC | 3692: Primary Batteries, Dry and Wet |
Sales Range | $50 M to 100M |
# of Employees | 209 |
Plant Area |
300,000
ft2
|
Annual Production | 225,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $657,447 | 10,865,141 |
kWh
|
$0.061 |
Electricity Demand | $320,789 | 20,372 |
kW-mo/yr
|
$15.75 |
Fuel Oil #4 | $512,848 | 41,099 |
MMBtu
|
$12.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $193,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,761 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $62,300 | $24,500 | - | - |
$62,300
-
MMBtu
|
|
02 | 2.7224: Reduce space conditioning during non-working hours | $47,607 | $22,000 |
$13,550
223,600
kWh
|
- |
$34,057
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $24,012 | $50,000 | - | - |
$24,012
-
MMBtu
|
|
04 | 2.2625: Chill water to the highest temperature possible | $14,298 | $11,500 |
$1,120
18,479
kWh
|
- |
$13,178
-
MMBtu
|
|
05 | 2.1116: Improve combustion control capability | $12,255 | $75,000 | - | - |
$12,255
-
MMBtu
|
|
06 | 2.3191: Use demand controller or load shedder | $11,448 | $2,500 | - |
$11,448
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,741 | - |
$3,233
53,352
kWh
|
$1,508
-
kW-mo/yr
|
- | |
08 | 2.2437: Recover waste heat from equipment | $4,655 | $4,000 | - | - |
$4,655
-
MMBtu
|
|
09 | 2.7241: Install outside air damper / economizer on hvac unit | $4,605 | $1,000 |
$4,605
76,000
kWh
|
- | - | |
10 | 2.6218: Turn off equipment when not in use | $4,007 | $12,000 |
$4,007
66,120
kWh
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,570 | $15,700 |
$1,750
28,872
kWh
|
$820
-
kW-mo/yr
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,045 | $5,670 |
$430
7,151
kWh
|
$615
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $193,543 | $223,870 |
$28,695
473,574
kWh
|
$14,391
-
kW-mo/yr
|
$150,457
-
MMBtu
|
||
TOTAL IMPLEMENTED | $138,761 | $185,170 |
$8,790
145,102
kWh
|
$13,571
-
kW-mo/yr
|
$116,400
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs