ITAC Assessment: MA0622
ITAC logo
ITAC Assessment: MA0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product tissue paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $1
M
to 5
M
# of Employees 121
Plant Area 208,000
ft2
Annual Production 43,800
ton
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,189,578 46,682,650
kWh
Electricity Demand $346,041 76,053
kW-mo/yr
Electricity Fees $848 -
Fuel Oil #2 $1,156,108 73,065
MMBtu
Fuel Oil #6 $2,981,695 342,186
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,433,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,899,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Wood Savings Ancillary Material Cost Savings
01 2.1331: Burn a less expensive grade of fuel $1,852,277 $4,120,500 - - - $2,980,440
-
MMBtu
$(-1,115,663.0)
-
MMBtu
$(-12,500.0)
02 2.2444: Use hot process fluids to preheat incoming process fluids $653,801 $423,075 $(-8,678.0)
(-65,350)
kWh
- $662,479
-
MMBtu
- - -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $449,650 $250,000 - - - $449,650
-
MMBtu
- -
04 2.4323: Use optimum size and capacity equipment $337,840 $694,400 $321,925
2,424,135
kWh
$15,915
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $67,981 $60,600 $64,932
488,949
kWh
$3,049
-
kW-mo/yr
- - - -
06 2.4321: Upgrade obsolete equipment $34,468 $111,500 $34,468
259,459
kWh
- - - - -
07 2.2136: Install / repair insulation on steam lines $21,165 $10,000 - - - $21,165
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,919 $30,500 $14,900
112,000
kWh
$1,019
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $3,433,101 $5,700,575 $427,547
3,219,193
kWh
$19,983
-
kW-mo/yr
$662,479
-
MMBtu
$3,451,255
-
MMBtu
$(-1,115,663.0)
-
MMBtu
$(-12,500.0)
TOTAL IMPLEMENTED $2,899,551 $5,359,475 $347,715
2,618,244
kWh
$15,915
-
kW-mo/yr
$662,479
-
MMBtu
$3,001,605
-
MMBtu
$(-1,115,663.0)
-
MMBtu
$(-12,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Wood Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs