Assessment Year | 2007 |
---|---|
Principal Product | Electron beam & laser beam welded metal parts |
NAICS | 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main |
SIC | 7692: Welding Repair |
Sales Range | $5 M to 10M |
# of Employees | 56 |
Plant Area |
46,042
ft2
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,276 | 1,666,185 |
kWh
|
$0.11 |
Electricity Demand | $51,398 | 5,912 |
kW-mo/yr
|
$8.69 |
Electricity Fees | $11,845 | - |
|
- |
Natural Gas | $9,972 | 558 |
MMBtu
|
$17.87 |
Fuel Oil #2 | $13,717 | 903 |
MMBtu
|
$15.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,092 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,663 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $8,579 | $2,348 |
$1,622
13,864
kWh
|
- |
$6,957
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,068 | $24,034 |
$7,065
60,386
kWh
|
$1,003
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $5,429 | $6,500 |
$5,429
46,400
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,016 | - |
$854
7,300
kWh
|
$162
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $23,092 | $32,882 |
$14,970
127,950
kWh
|
$1,165
-
kW-mo/yr
|
$6,957
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,663 | $26,382 |
$9,541
81,550
kWh
|
$1,165
-
kW-mo/yr
|
$6,957
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs