ITAC Assessment: MA0617
ITAC logo
ITAC Assessment: MA0617
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Electron beam & laser beam welded metal parts
NAICS 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
SIC 7692: Welding Repair
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 46,042
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,276 1,666,185
kWh
Electricity Demand $51,398 5,912
kW-mo/yr
Electricity Fees $11,845 -
Natural Gas $9,972 558
MMBtu
Fuel Oil #2 $13,717 903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7224: Reduce space conditioning during non-working hours $8,579 $2,348 $1,622
13,864
kWh
- $6,957
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,068 $24,034 $7,065
60,386
kWh
$1,003
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $5,429 $6,500 $5,429
46,400
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,016 - $854
7,300
kWh
$162
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,092 $32,882 $14,970
127,950
kWh
$1,165
-
kW-mo/yr
$6,957
-
MMBtu
TOTAL IMPLEMENTED $17,663 $26,382 $9,541
81,550
kWh
$1,165
-
kW-mo/yr
$6,957
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs