Assessment Year | 2006 |
---|---|
Principal Product | Water and solvent based urethanes |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
98,300
ft2
|
Annual Production | 1,000
Tgal
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,019 | 4,400,640 |
kWh
|
$0.003 |
Electricity Demand | $77,728 | 10,160 |
kW-mo/yr
|
$7.65 |
Natural Gas | $515,674 | 39,902 |
MMBtu
|
$12.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,759 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,922 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $38,346 | $38,000 | - | - |
$38,346
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,557 | $91,980 |
$32,253
398,190
kWh
|
$3,304
-
kW-mo/yr
|
- | |
03 | 2.2121: Increase amount of condensate returned | $20,310 | $45,000 | - | - |
$20,310
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,294 | $36,000 |
$13,543
167,200
kWh
|
$1,751
-
kW-mo/yr
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,181 | $83,000 |
$4,463
55,100
kWh
|
$2,754
-
kW-mo/yr
|
$(-3,036.0)
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,784 | $150 |
$1,417
17,500
kWh
|
$367
-
kW-mo/yr
|
- | |
07 | 2.2511: Insulate bare equipment | $1,575 | $2,925 | - | - |
$1,575
-
MMBtu
|
|
08 | 2.4323: Use optimum size and capacity equipment | $712 | $1,500 |
$567
7,000
kWh
|
$145
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $117,759 | $298,555 |
$52,243
644,990
kWh
|
$8,321
-
kW-mo/yr
|
$57,195
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,922 | $132,555 |
$47,780
589,890
kWh
|
$5,567
-
kW-mo/yr
|
$1,575
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs