ITAC Assessment: MA0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Water and solvent based urethanes
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 98,300
ft2
Annual Production 1,000
Tgal
Production Hrs. Annual 4,368
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,019 4,400,640
kWh
Electricity Demand $77,728 10,160
kW-mo/yr
Natural Gas $515,674 39,902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,922

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $38,346 $38,000 - - $38,346
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,557 $91,980 $32,253
398,190
kWh
$3,304
-
kW-mo/yr
-
03 2.2121: Increase amount of condensate returned $20,310 $45,000 - - $20,310
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,294 $36,000 $13,543
167,200
kWh
$1,751
-
kW-mo/yr
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,181 $83,000 $4,463
55,100
kWh
$2,754
-
kW-mo/yr
$(-3,036.0)
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,784 $150 $1,417
17,500
kWh
$367
-
kW-mo/yr
-
07 2.2511: Insulate bare equipment $1,575 $2,925 - - $1,575
-
MMBtu
08 2.4323: Use optimum size and capacity equipment $712 $1,500 $567
7,000
kWh
$145
-
kW-mo/yr
-
TOTAL RECOMMENDED $117,759 $298,555 $52,243
644,990
kWh
$8,321
-
kW-mo/yr
$57,195
-
MMBtu
TOTAL IMPLEMENTED $54,922 $132,555 $47,780
589,890
kWh
$5,567
-
kW-mo/yr
$1,575
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs