Assessment Year | 2006 |
---|---|
Principal Product | Die Cast Products |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3364: Nonferrous Die-Castings, Except Aluminum |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
75,000
ft2
|
Annual Production | 9,000,000
lb
|
Production Hrs. Annual | 4,905
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,684 | 1,768,800 |
kWh
|
$0.089 |
Electricity Demand | $21,934 | 6,667 |
kW-mo/yr
|
$3.29 |
Natural Gas | $334,038 | 33,346 |
MMBtu
|
$10.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,548 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $33,327 | $2,600 | - | - |
$1,369
-
MMBtu
|
$38,400 | $(-6,442.0) | |
02 | 2.2511: Insulate bare equipment | $20,912 | $14,335 | - | - |
$20,912
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,796 | $67,450 |
$14,796
123,300
kWh
|
- | - | - | - | |
04 | 2.6226: Optimize filtration cleaning / replacement to minimize air resistance | $8,539 | $8,050 |
$8,184
68,200
kWh
|
$355
-
kW-mo/yr
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,518 | $12,500 |
$5,124
42,700
kWh
|
$394
-
kW-mo/yr
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $3,250 | $8,000 | - |
$3,250
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,206 | $13,536 |
$2,976
24,800
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $89,548 | $126,471 |
$31,080
259,000
kWh
|
$4,229
-
kW-mo/yr
|
$22,281
-
MMBtu
|
$38,400 | $(-6,442.0) | ||
TOTAL IMPLEMENTED | $32,657 | $35,921 |
$11,160
93,000
kWh
|
$585
-
kW-mo/yr
|
$20,912
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs